The next day was a big one for inspections. We started with APS, who inspected the electrical trench so it could be backfilled. It took about five minutes.










We weren't so lucky with the county inspector, who came out for the house wrap inspection. The framing crew didn't tape the seams of the house wrap. Also, the windows were flashed incorrectly. That was disappointing, because we needed to pass that inspection to move forward.

Gerald placed calls to our contractor and the head of the framing crew. That done, there was nothing left to do, and we needed to get to Kingman.