Our framing crew had failed to install one I-joist, so we had to get a letter from a contractor indicating a fix. We did, and Gerald and J.C. installed some additional material to bridge the span.
I had to hold my breath. I think even J.C. was nervous on this tall ladder.
After lunch, Gerald and I did some deckwork. J.C. helped after he finished some last-minute electrical changes. By about 3 p.m., we had about two-thirds of the south side of the porch done.
No comments:
Post a Comment