
On our next visit, Gerald and I continued the work we had started on the ceilings.
Gerald had finished another faux beam, which he installed above the interior barn doors.

Then we tackled the kitchen ceiling. The gap will be covered by another faux beam.
The kitchen provided certain, um, challenges. Like a number of light fixtures and speakers that required cutouts.
Also, the counters and appliances that we had put in place made things interesting as we had to work around all of that.

We saved the last little bit for the next day, and it was a good thing we did. This little section was the most difficult because the countertops and sink meant we had to use all manner of props to reach the last few feet. But by lunchtime it was all done.

That allowed Gerald to install light fixtures and such. Since his thumb was still a bit disabled, the work was accompanied by quite a flurry of colorful language.
No comments:
Post a Comment