We decided to go with the same look: rebar with well pipe for a top rail.
We marked where the holes should be drilled but marking a flat board then holding it up to each support post, in turn, marking where each should be drilled.
Then Gerald drilled the holes at an angle, cut the materials and put them in place.
For some reason, we thought we needed more rods than we did. Fortunately, we figure it out before we cut them all. When it's all done, we'll cut the top of the post to a reasonable height.
No comments:
Post a Comment