Inching Closer Toward the Final Inspection

The rest of the time, we spent covering the rest of the studs and insulation as required for the final.

We had left one part of the north wall undone until we decided whether we wanted to finish it with brick or the natural wood we had used elsewhere. We settled on the brick. So Gerald sheeting the remaining wall with plywood.





The other area was the guest room closet. We put that off until last because it was holding all of our tools.

Gerald dismantled the shelves.









But not before we had relocated the tools unto folding tables. We took the tools and equipment we were finished with down to the garage and still managed to fill up three tables.










Gerald was able to tape and apply the first coat of mud before we left.

We had hoped to get to the crawl space opening, but had to leave it for the next trip. We hope that with JC's help we can get everything done for the final with the exception of the site work next time. We'll see....