Monday, January 10, 2011

Master Bath

In between coats of paint and glaze in the closet, Gerald worked on the master bathroom.

For the shower floor, he installed river rock in webbed panels, and grouted it.









He also starting laying tile on the floor. We had bought honed slate, which looked really beautiful.











J.C. installed the toilet.













With the floor in place, Gerald started working on the tub surround. It was tough job and took a long time, like a puzzle with lots of little pieces.











J.C. installed the fixtures in the tub. Bath fixtures turned out to be incredibly expensive. We saved some money by using a kitchen faucet, which had the advantage of having a pull-out sprayer. We decided that might come in handy for washing hair or pets.

No comments: