The last big project that remained was the "summer" masterbathroom shower. Gerald was uncomfortable installing the glass block, so we hired a tiler. In the end, we decided to have him to the whole thing.
For the walls, we used ceramic tile we had picked up at a Habitat store. The green was a perfect match of our wall color.
We used the river rock he already had for the floor.
Here's how it looked when the job was finished. With the shower done, Gerald was free to install what was left of the molding. And the upstairs was done.
Friday, July 6, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment